Pagina 16 din 25
Analize ale evoluțiilor privind transformatoarele, stațiile electrice și rețelele, scrise pentru cei care exploatează echipamentele. Fiecare text este interpretarea noastră a unei evoluții — trimitem la sursă, nu o reproducem.
181–192 din 297
Transelectrica advances 400 kV Suceava–Bălți line and Botoșani substation
Transelectrica progresses the 400 kV Suceava–Bălți cross-border link with a 133 million lei investment, reinforcing the Botoșani transformer substation.
Relatat de Energynomics

Fırat EDAŞ allocates 6.6 billion liras to Elazığ distribution grid
Fırat EDAŞ directs 6.1 billion liras to network expansion and 427 million liras to maintenance in Elazığ, backed by a 6.6 billion lira plan to 2026.
Relatat de Enerji Günlüğü
Uganda courts EU investors to scale grid capacity to 20000 MW by 2040
Uganda targets 20000 MW by 2040 and courts EU capital for transmission and generation assets to underpin a 500 billion dollar economic expansion.
Relatat de AllAfrica

EIB and Ukraine review EUR 275 million funding for substation resilience
Ukraine and the EIB review a EUR 275 million financing plan to reinforce Ukrenergo substations against extensive physical damage and operational failures.
Relatat de Interfax-Ukraine

TARIL Expands UK Footprint with 13.3 Million Dollar Investment
A 13.3 million dollar investment into Maxwell Grid Transformers aims to expand high-voltage equipment sales and servicing across British networks.
Relatat de Transformer Technology

Eastern Green Link 1 transformer ready for transport ahead of 2027 installation
A major transformer for Eastern Green Link 1 has left the factory for transport ahead of site installation from July 2027, raising staging priorities.
Relatat de New Civil Engineer
Financing secured for 58 MW Romanian solar site with 88 MWh battery plans
Debt financing of €25.5 million supports a 58 MW solar plant in Romania, with an 88 MWh battery storage system planned for a subsequent phase.
Relatat de SEE Energy News

Elvia Awards 6.1M Dollar Substation Contract for Norway Grid Expansion
Elvia awards a 6.1 million dollar contract for the Isebakke substation in Norway, targeting completion after summer 2028 to boost grid capacity.
Relatat de Transformer Technology
Nigeria grid collapses by 81 per cent as generating plants drop from 21 to 2
Nigeria's power grid lost 81.5 per cent of supply as generation plummeted to 675 MW, exposing substation transformers to severe system stress.
Relatat de AllAfrica

Moldova Advances 400 kV Transmission Link Following Substation Transformer Repair
Moldova prepares to commission its 400 kV Vulcănești–Chișinău line following transformer repair in Spain and final substation integration tests.
Relatat de Transformer Technology

EPDK mandates 1-hour reporting for grid capacity changes
Türkiye regulatory authority EPDK mandates that capacity changes from faults or maintenance must be reported within 1 hour of occurrence.
Relatat de Enerji Günlüğü

Kuwait advances transmission infrastructure for major residential schemes
Kuwait awards transmission packages for large housing schemes, expanding regional substation capacity and challenging regional equipment delivery windows.
Relatat de MEED
Începeți cu o evaluare a stării tehnice
Descrieți-ne echipamentele, amplasamentul și situația. Dacă starea parcului nu este cunoscută, o evaluare este calea cu cel mai mic angajament de a afla ce aveți de fapt — și stabilește tot ce urmează.