Plant and equipment schedule
Instrumentele și instalațiile de care are nevoie un program pe amplasament, pe categorii. Producătorii, modelele, numărul și proprietatea vor fi publicate aici după aprobare; până atunci, doar categoriile.
Written to be lifted straight into a prequalification pack, alongside the certificates and the personnel CVs. It prints.
The oil tests, with their standards- Instrument categories
- 09
- Plant categories
- 08
- Încercări de ulei în catalog
- 15
01Instruments
Test and diagnostic instruments
What proves we can measure it: diagnostics, insulation, winding resistance, breaker timing, protection, hi-pot, earthing, thermal and battery.

- 01Transformer diagnostics
- 02Insulation testing
- 03Resistance measurement
- 04Circuit breaker testing
- 05Protection and relay testing
- 06High-voltage withstand
- 07Earthing measurement
- 08Thermography
- 09Battery and DC systems
02Plant
Oil treatment, drying, power and lifting plant
What proves we can get there and finish. The instruments answer whether we can measure it; this answers whether we arrive complete.

- 01Oil treatment plant
- 02Vacuum and drying plant
- 03Oil handling, filtration and storage
- 04Workshop plant
- 05Site generation, distribution and welfare
- 06Lifting, jacking and access equipment
- 07Vehicles, containers and spares kits
- 08HSE, gas detection and rescue equipment
Ask for the schedule as a document
We will send the equipment schedule with the rest of the prequalification pack.