Σελίδα 16 από 25
Αναλύσεις των εξελίξεων σε μετασχηματιστές, υποσταθμούς και δίκτυα, γραμμένες για όσους λειτουργούν τον εξοπλισμό. Κάθε κείμενο είναι η δική μας ανάγνωση μιας εξέλιξης — παραπέμπουμε στην πηγή αντί να την αναδημοσιεύουμε.
181–192 από 297
Transelectrica advances 400 kV Suceava–Bălți line and Botoșani substation
Transelectrica progresses the 400 kV Suceava–Bălți cross-border link with a 133 million lei investment, reinforcing the Botoșani transformer substation.
Αναφέρθηκε από Energynomics

Fırat EDAŞ allocates 6.6 billion liras to Elazığ distribution grid
Fırat EDAŞ directs 6.1 billion liras to network expansion and 427 million liras to maintenance in Elazığ, backed by a 6.6 billion lira plan to 2026.
Αναφέρθηκε από Enerji Günlüğü
Uganda courts EU investors to scale grid capacity to 20000 MW by 2040
Uganda targets 20000 MW by 2040 and courts EU capital for transmission and generation assets to underpin a 500 billion dollar economic expansion.
Αναφέρθηκε από AllAfrica

EIB and Ukraine review EUR 275 million funding for substation resilience
Ukraine and the EIB review a EUR 275 million financing plan to reinforce Ukrenergo substations against extensive physical damage and operational failures.
Αναφέρθηκε από Interfax-Ukraine

TARIL Expands UK Footprint with 13.3 Million Dollar Investment
A 13.3 million dollar investment into Maxwell Grid Transformers aims to expand high-voltage equipment sales and servicing across British networks.
Αναφέρθηκε από Transformer Technology

Eastern Green Link 1 transformer ready for transport ahead of 2027 installation
A major transformer for Eastern Green Link 1 has left the factory for transport ahead of site installation from July 2027, raising staging priorities.
Αναφέρθηκε από New Civil Engineer
Financing secured for 58 MW Romanian solar site with 88 MWh battery plans
Debt financing of €25.5 million supports a 58 MW solar plant in Romania, with an 88 MWh battery storage system planned for a subsequent phase.
Αναφέρθηκε από SEE Energy News

Elvia Awards 6.1M Dollar Substation Contract for Norway Grid Expansion
Elvia awards a 6.1 million dollar contract for the Isebakke substation in Norway, targeting completion after summer 2028 to boost grid capacity.
Αναφέρθηκε από Transformer Technology
Nigeria grid collapses by 81 per cent as generating plants drop from 21 to 2
Nigeria's power grid lost 81.5 per cent of supply as generation plummeted to 675 MW, exposing substation transformers to severe system stress.
Αναφέρθηκε από AllAfrica

Moldova Advances 400 kV Transmission Link Following Substation Transformer Repair
Moldova prepares to commission its 400 kV Vulcănești–Chișinău line following transformer repair in Spain and final substation integration tests.
Αναφέρθηκε από Transformer Technology

EPDK mandates 1-hour reporting for grid capacity changes
Türkiye regulatory authority EPDK mandates that capacity changes from faults or maintenance must be reported within 1 hour of occurrence.
Αναφέρθηκε από Enerji Günlüğü

Kuwait advances transmission infrastructure for major residential schemes
Kuwait awards transmission packages for large housing schemes, expanding regional substation capacity and challenging regional equipment delivery windows.
Αναφέρθηκε από MEED
Ξεκινήστε με μια αξιολόγηση κατάστασης
Περιγράψτε μας τον εξοπλισμό, την εγκατάσταση και την κατάσταση. Αν η κατάσταση των μετασχηματιστών σας είναι άγνωστη, η αξιολόγηση είναι ο τρόπος με τη μικρότερη δέσμευση για να μάθετε τι πραγματικά έχετε — και καθορίζει ό,τι ακολουθεί.