Μετάβαση στο περιεχόμενο
ΓραφείοUTC+3—Η ώρα σας+44 7438 092555Σύνδεση
ELΕλληνικά
/sectors

Sectors

The transformer is broadly the same asset everywhere. What differs is what happens when it fails, and that is what shapes the programme.

01Who we work for

The asset is similar; the consequence of losing it is not.

Ordered by how naturally a sector buys a programme rather than a single visit — fleet owners first — not by market size.

  • Transmission and distribution utilities

    Ageing fleets and reliability targets, with the work funded through a regulated investment plan or a development-bank rehabilitation programme. Either way, each intervention has to be justified with condition evidence.

  • Manufacturing and heavy industry

    Cement, steel, textiles, food processing and chemicals — continuous processes where an unplanned transformer outage stops the line.

  • Independent power producers

    Contractual availability obligations, and lenders who require documented, auditable asset management. Test evidence is a reporting deliverable, not a nicety.

  • Oil, gas and petrochemicals

    Onshore and offshore, hazardous area discipline, and a consequence of failure measured in more than lost production.

  • Renewables and storage

    Solar plants, wind farms, battery storage and collector substations, frequently remote and frequently commissioned to a fixed grid-connection date.

  • Mining and metals

    Remote sites, heavy and harsh duty, and an extremely high cost of downtime. Often self-generating, which makes the transformer a single point of failure for the whole operation.

  • EPC contractors

    Installation and commissioning packages inside a larger project, where the only thing that matters is mobilising on the date agreed.

  • Critical infrastructure

    Hospitals, airports, water utilities and ports, where the tolerance for an unplanned outage is effectively zero.

  • Telecoms and data infrastructure

    Distributed power assets whose reliability underpins service availability across a whole network.

  • Rural electrification and mini-grids

    Distribution transformer fleets spread across long distances, usually under development-finance programmes with their own procurement rules and reporting.

Start with a condition assessment

Tell us the assets, the site and the situation. If the fleet's condition is unknown, an assessment is the lowest-commitment way to find out what you actually have — and it defines whatever comes next.