Plant and equipment schedule
الأجهزة والوحدات التي يحتاجها البرنامج في الموقع، مصنفة حسب الفئة. ستُنشر هنا العلامات التجارية والطرازات والأعداد والملكية بعد اعتمادها؛ وحتى ذلك الحين، الفئات فقط.
Written to be lifted straight into a prequalification pack, alongside the certificates and the personnel CVs. It prints.
The oil tests, with their standards- Instrument categories
- 09
- Plant categories
- 08
- اختبارات الزيت في الجدول
- 15
01Instruments
Test and diagnostic instruments
What proves we can measure it: diagnostics, insulation, winding resistance, breaker timing, protection, hi-pot, earthing, thermal and battery.

- 01Transformer diagnostics
- 02Insulation testing
- 03Resistance measurement
- 04Circuit breaker testing
- 05Protection and relay testing
- 06High-voltage withstand
- 07Earthing measurement
- 08Thermography
- 09Battery and DC systems
02Plant
Oil treatment, drying, power and lifting plant
What proves we can get there and finish. The instruments answer whether we can measure it; this answers whether we arrive complete.

- 01Oil treatment plant
- 02Vacuum and drying plant
- 03Oil handling, filtration and storage
- 04Workshop plant
- 05Site generation, distribution and welfare
- 06Lifting, jacking and access equipment
- 07Vehicles, containers and spares kits
- 08HSE, gas detection and rescue equipment
Ask for the schedule as a document
We will send the equipment schedule with the rest of the prequalification pack.