Stranica 24 od 25
Analize zbivanja u području transformatora, trafostanica i mreža, pisane za one koji upravljaju tom opremom. Svaki je tekst naše vlastito tumačenje nekog događaja – upućujemo na izvor umjesto da ga prenosimo.
277–288 od 298
NamPower sets 70% renewable energy target by 2030
NamPower plans major solar, wind and battery storage projects to reach 70% renewable generation by 2030, driving transformer and substation upgrades.
Izvor: AllAfrica

TEİAŞ Reports Remaining Distribution-Level Unlicensed Capacity
TEİAŞ confirms that remaining unlicensed solar and wind distribution capacity across transformer substations in Türkiye has dropped to 624 MW.
Izvor: Enerji Günlüğü

Jordan Desalination Project Integrates 281 MW Solar Plant
Jordan’s 6 billion dollar water scheme uses a 281 MW solar plant and grid supply for a 438 km pipeline, supplying 300 million cubic metres with 27 percent solar
Izvor: Yeşil Haber

Eskom reaches 500 days without load shedding as generation availability hits 68.11%
South Africa marks over 500 days without load shedding with EAF reaching 68.11%, offering utilities a window for critical substation maintenance.
Izvor: Eskom
North Macedonia begins €46 million hydropower plant modernisation phase
North Macedonia starts a €46 million upgrade across six hydropower plants, adding 13.5 MW in capacity and 50 GWh of annual energy generation.
Izvor: SEE Energy News

National Grid Allocates £600M Substation Civils Framework Across 31 Suppliers
National Grid Electricity Distribution selects 31 civil engineering partners for a £600M framework to prepare substation compounds for network growth.
Izvor: New Civil Engineer

Türkiye Unlicensed Renewable Grid Capacity Drops Near Zero
TEİAŞ transmission capacity map shows available headroom for unlicensed solar and wind power dropped from 1.500 MW down to 38.3 MW in Türkiye.
Izvor: Yeşil Haber

South Africa advances independent transmission programme to unlock grid capacity
South Africa reaffirms its independent transmission programme, launching the next procurement phase to fund new substations and transmission corridors.
Izvor: Infrastructure News

Sarajevo 12 Substation Online to Reinforce Bosnia 110 kV Grid
Elektroprijenos BiH has commissioned the Sarajevo 12 110 kV substation, deploying 40 MVA transformers to relieve Sarajevo 7 and Sarajevo 13 nodes.
Izvor: Transformer Technology

NESO Seeks 1-Month Extension From Ofgem for Gate 2 Phase 1 Grid Offers
NESO has requested a 1-month delay from regulator Ofgem to process complex transmission connection offers under Phase 1 of its Gate 2 reform.
Izvor: Solar Power Portal

Zambia approves 350 MW wind plant and 330 kV grid link
Environmental approval for Zambia's 350 MW wind project with 42 turbines requires a 330 kV substation and line expansion to ensure power evacuation.
Izvor: Lusaka Times

Hybrid renewable expansion in Bulgaria underscores grid integration demands
Renalfa IPP and Eurowind Energy inaugurate the enlarged Tenevo hybrid renewable complex in Bulgaria, presenting collector substation challenges.
Izvor: Balkan Green Energy News
Počnite ocjenom stanja
Opišite nam opremu, lokaciju i situaciju. Ako stanje parka nije poznato, ocjena stanja najjednostavniji je način da uz najmanju obvezu saznate što zapravo imate – a ona određuje i sve što slijedi.