Transformer service programmes

Trafoser is bought as a programme with a defined outcome, not as a list of service line items. That is how utilities, industrial operators, IPPs and development-finance programmes actually procure, and it is how these pages are organised.

Hizmet programları
08
Mobilizasyon aşamaları
08
A laptop showing frequency-response traces, set on the open case of a test instrument on a transformer cover, with test leads running to the bushings
Sweep frequency response analysis run from the transformer cover, the traces on the laptop.
01/08Start here

Fleet condition assessment

A structured survey of your transformer population that produces a ranked, evidence-based picture of asset health and a prioritised intervention plan.

Read the programme

Work executed and reported against

IEC 60567IEC 60599IEEE C57.104IEC 61198IEC 60270IEC 60137
A transformer active part hanging from a crane hook above its open tank against a deep blue sky, with two fitters at the tank edge
An active part craned over its tank, with fitters at the tank edge.
02/08

Rehabilitation and life extension

Refurbishing a degraded transformer and returning it to reliable service instead of replacing it — weeks instead of years, at a fraction of replacement cost.

Read the programme

Work executed and reported against

IEC 60214-1IEC 60422IEC 60296
Two technicians connecting hoses between a large black oil storage bladder and a treatment plant under a plastic sheet, beside a power transformer, the work area taped off
Oil treatment beside the transformer: the oil held in a bladder, the plant under cover and the area taped off.
03/08

Oil management programmes

Ongoing custody of transformer oil condition across a site or fleet. A single oil test is data; a trend is a decision.

Read the programme

Work executed and reported against

IEC 60422IEC 60814IEC 62021-1IEC 60156IEC 62535
A technician in a crane-mounted basket guiding a tall high-voltage bushing on a lifting sling, while a second technician steadies its base at the transformer
An active part lifted from its tank in the switchyard under a mobile crane.Fitting a high-voltage bushing, guided from a crane basket and steadied at the turret.
04/08

Installation and commissioning

New assets from delivery to energisation, with the test evidence a lender or an asset owner reviews before accepting the asset.

Read the programme
A fire-damaged transformer with a scorched, blackened tank and burnt fittings on its cover, standing outside a brick building, with a cable drum and coiled cable beside it
A transformer after a fire, its tank scorched and its fittings burnt out.
06/08

Emergency and failure recovery

Mobilised breakdown response to remote sites, and the forensic work that establishes what actually happened.

Read the programme

Work executed and reported against

IEC 60076-18

Acil müdahale ekipleri

7/24, yılın 365 günü hizmetinizde — Noel, yılbaşı gecesi ve dünyadaki tüm resmî tatiller dahil

Ofis hattı, çalışma saatlerinde+44 7438 092555
07/08

Training and capacity building

Capability that stays behind after demobilisation. Frequently a contractual requirement where a development bank funds the work.

Read the programme
01Remote and cross-border sites

Reach is part of the scope

For a remote or cross-border site, the programme also carries shipping, temporary import, customs, permits, abnormal-load transport, site generation, fuel and water planning, satellite communications, and a contingency for the part that does not clear customs. It is planned before the technical work, because it decides whether the technical work happens.

Mobilisation — eight stages, enquiry to demobilisation

  1. Enquiry

  2. 02

    Site survey

  3. 03

    Mobilisation plan

  4. 04

    Shipping and clearance

  5. 05

    Team deployment

  6. 06

    On-site works

  7. 07

    Testing and handover

  8. 08

    Demobilisation

02From a finding to a programme

Programme scope builder

Choose what testing or inspection has shown, and see the tests that characterise it, the standards it is read against and the programmes that address it.

Select what you have found

Where this leads

Hizmet programları
00
Test methods
00
Standart tanımları
00

Select a finding to see the tests, standards and programmes that follow from it.

Guidance, not a diagnosis. What a result means depends on the unit's history, loading and other readings, and only an engineer who has seen all of them can say.

Transformatör sayısı

Fleet size sets the order of work.

Sent with the enquiry

Recorded for the engineer. The scope does not change.

Liquid-filled asset

Dry type: Cast resin and VPI — inspection, cleaning and electrical testing. No oil work applies. Transformer scope

Gerilim aralığı

Classed by the highest voltage for equipment, Um.

Hizmet programları
00
Test methods
00
Standart tanımları
00
Where this leads

Start with a condition assessment

Tell us the assets, the site and the situation. If the fleet's condition is unknown, an assessment is the lowest-commitment way to find out what you actually have — and it defines whatever comes next.