Sanayide enerji: transformatör ve şebeke haberleri
Transformatör, trafo merkezi ve şebeke alanındaki gelişmelerin, bu tesisleri işletenler için yazılmış analizi. Her yazı bir gelişmeye ilişkin kendi değerlendirmemizdir; kaynağı yeniden yayımlamaz, ona bağlantı veririz.
14 / 14
Filtreleri temizle
Tunisian Industry Denounces Arbitrary Summer 2026 Power Outages
Tunisian industrial operators raise concerns over summer 2026 load shedding as grid stress highlights vulnerabilities in substation infrastructure.
Haber kaynağı: La Presse de Tunisie

National Grid starts 400kV transmission substation construction in Somerset
Construction has begun on a 400kV substation in Somerset to connect the Gravity Smart Campus to the transmission system, boosting regional grid capability.
Haber kaynağı: New Civil Engineer

West Midlands Grid Partnership to Unlock Industrial Power Capacity
National Grid Electricity Distribution collaborates with West Midlands partners to test dynamic grid capacity solutions for local manufacturing plants.
Haber kaynağı: The Energyst
Integrating BESS with gas CHP on 11 kV switchboards
Adding battery storage to gas CHP on 11 kV switchboards presents complex protection, fault level and islanding challenges for site engineers.
Haber kaynağı: Electrical Times
Serbia energy law allows industrial plants to generate store and trade power
Serbia has updated its energy legislation to allow major industrial consumers to operate as active market participants by generating and trading power.
Haber kaynağı: SEE Energy News
Koruson 2 Reaches Commercial Operation with 520MW Generation in South Africa
The Koruson 2 project brings 520 MW of wind and solar power to South Africa, highlighting grid connection needs for industrial mining decarbonisation.
Haber kaynağı: Construction Review Online
Managing extra high voltage connection risks for industrial and storage assets
Extra high voltage grid connections require early engineering integration to prevent costly delay risks across complex multi-party power projects.
Haber kaynağı: New Civil Engineer
Valencia Tenders $20.8 Million Port Substation Project
Valencia issues a $20.8 million tender for a new gas-insulated substation to power maritime shore infrastructure, with construction planned for 20 months.
Haber kaynağı: Transformers Magazine
Mozambique plans 126 million dollar solar plant for mining loads in Gaza province
Mozambique plans a 126 million dollar solar farm in Gaza province to power mining operations, requiring robust substation design and grid integration.
Haber kaynağı: AllAfrica

TEİAŞ advances 154 kV grid link for Türkoğlu industrial zone
TEİAŞ initiates urgent land acquisition for a 154 kV transmission connection linking Türkoğlu industrial zone and industrial facilities in Kahramanmaraş.
Haber kaynağı: Enerji Günlüğü

Pure DC Installs 75 MVA Unit at London Site
Pure DC has placed a 75 MVA transformer at its 90 MW London facility, pushing total substation capacity to 150 MVA ahead of energisation in 2026.
Haber kaynağı: Transformer Technology
Romania Mintia gas plant begins commissioning for grid connection
Romania starts commissioning the 1.7 GW Mintia gas-fired plant, representing a €1.2 billion investment to stabilize the regional electricity grid.
Haber kaynağı: SEE Energy News

Accelerating Industrial Grid Connections Through Operator-Controlled Storage
National Grid, Net Zero Industry Wales, and Celtic Freeport target industrial connection delays using network operator-controlled battery storage systems.
Haber kaynağı: T&D World

Jordan Desalination Project Integrates 281 MW Solar Plant
Jordan’s 6 billion dollar water scheme uses a 281 MW solar plant and grid supply for a 438 km pipeline, supplying 300 million cubic metres with 27 percent solar
Haber kaynağı: Yeşil Haber
Bir durum değerlendirmesiyle başlayın
Ekipmanları, sahayı ve mevcut durumu anlatın. Transformatörlerinizin durumu bilinmiyorsa, durum değerlendirmesi elinizde gerçekte ne olduğunu öğrenmenin en az taahhüt gerektiren yoludur — ve sonrasında yapılacak her şeyi belirler.