Página 22 de 25
Análise da evolução de transformadores, subestações e redes, escrita para quem gere os equipamentos. Cada texto é a nossa própria leitura de uma evolução — remetemos para a fonte em vez de a reproduzir.
253–264 de 298

Greenvolt lands project financing for major Romanian wind farm
Greenvolt secures project funding for a wind farm in Romania, highlighting growing grid integration requirements for high-capacity renewable assets.
Noticiado por The Energyst
Slovenia extends application deadline for €68.97 million grid upgrade scheme
Slovenia gives distribution grid applicants an additional month until 30 November 2026 to complete technical proposals for the €68.97 million allocation.
Noticiado por SEE Energy News
DRC and Zambia advance cross-border transmission corridor for mining power
DRC and Zambia sign framework for a $300m cross-border power transmission line, reinforcing high-voltage interconnector capacity for regional mining.
Noticiado por AllAfrica

European DSO signs 32 million dollar distribution transformer framework deal
European distribution transformer procurement highlights long lead times, with a 32 million dollar framework contract securing supply into 2028.
Noticiado por Transformer Technology

Battery storage beats gas peakers on cost across 43 modelled markets
Battery storage is now cheaper than gas peaking across 43 global markets, driving new transformer and collector substation requirements for grid operators.
Noticiado por The Energyst

Tunisia tenders 300MW multi-site battery storage system
Tunisia launches a tender for a 300MW and 600MWh battery storage project across multiple regions, creating new substation and grid integration demands.
Noticiado por MEED

Ukraine receives 4807 power units in 2026 with 1077 more planned
Ukraine has received 4807 power equipment units in 2026 and expects 1077 more, highlighting international aid logistics for energy infrastructure resilience.
Noticiado por Interfax-Ukraine
Albania advances Project Blue hybrid scheme with 130 MWh storage deal
Albania's Project Blue deploys 185 MW solar and 130 MWh storage with 13 transformer units, presenting new duty cycle demands for hybrid collector grids.
Noticiado por SEE Energy News

Kolektor Etra Expands Power Transformer Production Capacity in Serbia
Kolektor Etra adds production space in Barajevo, Serbia, addressing power transformer supply bottlenecks across regional electricity networks.
Noticiado por Balkan Green Energy News

National Grid completes Thames cable tunnel 49 days early
National Grid has finished a 2.2 km high-voltage cable tunnel beneath the Thames 49 days ahead of schedule, easing urban substation integration.
Noticiado por Transformers Magazine
Romania–Moldova interconnector progresses to reinforce regional grid security
Moldova advances the Straseni–Gutinas interconnector to Romania, strengthening high-voltage transmission resilience across regional networks.
Noticiado por SEE Energy News
Zambia Generation Capacity Reaches 4722MW as Grid Infrastructure Lags
Zambia has expanded installed generation to 4722.3 megawatts, but transmission bottlenecks hinder delivery against a 2400 megawatt peak demand.
Noticiado por Lusaka Times
Comece por uma avaliação do estado
Indique-nos os equipamentos, o local e a situação. Se o estado do parque é desconhecido, uma avaliação é a forma de menor compromisso para saber o que realmente tem — e define o que vier a seguir.