Project references
What was delivered, where, on what asset, and whether it finished. Enough detail for an engineer to judge whether it resembles their own fleet.
- References published
- 00
Every published reference gives the sector, the country, the asset class and rating, the scope of work and the standards applied. It never names a client without written permission to do so.
Nothing is published here yet
Trafoser is a new entity and has not yet delivered a project anywhere. The work behind this company was carried out by Trafo Servis Mühendislik, and the relationship between the two is not yet settled — so that work is not ours to publish under this name.
A reference appears here when two separate things are true: the work is ours to claim, with the delivering entity named on the card, and the customer has permitted publication in the form shown. Neither of those answers the other.
What each field holds
- 01
Sector
One of the 10 sectors this site describes.
- 02
Country
The country, named in your language.
- 03
Assets
How many units, and of which class.
- 04
Rating
Rated power in MVA and the voltage pair in kV, entered as numbers.
- 05
Year
The year alone. Never a month or a day.
- 06
Programme
The programme the work came under, linked to what it covers.
- 07
Duration
Days on site, where the record holds them.
- 08
Standards
Each standard the work was carried out to, by its exact designation.
A reference's heading is composed from these fields, and none of them is a client's name.
What can be checked in the meantime
- /capabilities
What we can actually do — the capability reference
15Oil tests in the schedule
- /capabilities/equipment
Plant and equipment schedule
09Instrument categories
- /how-we-mobilise
How a mobilisation is planned and executed
08Mobilisation stages
Start with a condition assessment
Tell us the assets, the site and the situation. If the fleet's condition is unknown, an assessment is the lowest-commitment way to find out what you actually have — and it defines whatever comes next.