Page 13 of 25
Analysis of transformer, substation and grid developments, written for people who run the assets. Every piece is our own reading of a development — we link the source rather than reprint it.
145–156 of 297
HOPS transfers 110 kV cross-border line assets to EMS
Croatian TSO HOPS transfers the Serbian section of a 110 kV line to EMS, streamlining maintenance and cross-border grid operations across the Balkans.
Reported by SEE Energy News

Delgaz Grid completes 4.7 million euro Vicov substation upgrade in Romania
Delgaz Grid has upgraded the 110/20 kV Vicov substation in Romania, spending 4.7 million euros on primary switchgear and SCADA integration.
Reported by Transformer Technology

Portugal mandates grid-forming BESS for network stability
Portugal requires grid-forming capabilities for large battery systems to support network stability alongside a 1 GW storage procurement tender.
Reported by Energy-Storage.news
Managing extra high voltage connection risks for industrial and storage assets
Extra high voltage grid connections require early engineering integration to prevent costly delay risks across complex multi-party power projects.
Reported by New Civil Engineer

Croatia orders phase-shifting transformer to manage transmission power flows
Croatian transmission system operator HOPS awards a phase-shifting transformer contract to manage network power flows at the Gracac substation.
Reported by Transformer Technology

Portugal Enforces Grid-Forming Rules for Large Battery Storage
Portugal mandates grid-forming capabilities for battery storage assets at 45 MW or 110 kV, altering substation design and relay protection requirements.
Reported by Yeşil Haber

Hornsea 3 onshore converter station receives final super-heavy transformer
Delivery of the final 272-tonne transformer for the Hornsea 3 onshore converter station marks a key logistics milestone for UK offshore wind integration.
Reported by Transformer Technology
Balkan power grid faces stress as Romanian unit 5 trips
Romania generation failures increase import dependence in Serbia, raising thermal strain on transmission transformers and cross-border interconnectors.
Reported by SEE Energy News
Valencia Tenders $20.8 Million Port Substation Project
Valencia issues a $20.8 million tender for a new gas-insulated substation to power maritime shore infrastructure, with construction planned for 20 months.
Reported by Transformers Magazine

Birleşim Enerji seeks regulatory approval for storage addition at Yozgat wind farm
Birleşim Enerji applies to EPDK to integrate a 20 MWh battery storage system and expand wind generation capacity to 40 MWm in Yozgat, Türkiye.
Reported by Yeşil Haber
Integrated renewable energy plants reshape collector substations by 2030
Transitioning from standalone generation assets to integrated energy systems requires updated substation designs, multi-directional flows and storage integratio
Reported by SEE Energy News
UK approves 800 MW solar and battery storage park in Nottinghamshire
UK government approves the 800 MW Great North Road solar and battery park, raising grid integration and high-voltage transformer procurement priorities.
Reported by Construction Review Online
Start with a condition assessment
Tell us the assets, the site and the situation. If the fleet's condition is unknown, an assessment is the lowest-commitment way to find out what you actually have — and it defines whatever comes next.