الصفحة 21 من 25
تحليل لمستجدات المحولات ومحطات التحويل والشبكات، مكتوب لمن يشغّلون الأصول. كل مقال قراءتنا الخاصة لتطوّر ما — نضع رابط المصدر بدل إعادة نشره.
241–252 من 298
Albania merchant solar project orders 130 MWh battery and 13 transformers
Albania's Project Blue orders a 130 MWh battery storage system with 26 battery units and 13 transformers for merchant solar integration.
نقلًا عن SEE Energy News
Romania advances €800 million EIB nuclear financing package for Cernavodă unit 1

TEİAŞ and Armenia discuss reviving the Kars–Gyumri transmission line
TEİAŞ and Armenian power network operators met on October 5 to discuss restoring the idle Kars–Gyumri cross-border line and border substation assets.
نقلًا عن Yeşil Haber

TEİAŞ confirms route for 400 kV Konya to Sivrihisar line
TEİAŞ sets the route for its 400 kV transmission link from Konya to Sivrihisar, securing land rights to expand bulk transmission for solar power.
نقلًا عن Enerji Günlüğü

TEİAŞ Plans New 400/154 kV Havza Substation in Ankara
TEİAŞ is set to construct a 400/154 kV substation in Ankara, expanding transmission capacity and unlocking new grid connections across central Türkiye.
نقلًا عن Enerji Günlüğü
Romania approaches import limit as Turceni outage tightens grid margins
Romanian power imports reached 3.4 GW following a 285 MW coal outage, pushing cross-border transmission substations close to physical transfer ceilings.
نقلًا عن SEE Energy News

TEİAŞ secures urgent expropriation decrees for substation and transmission projects
TEİAŞ gains fast-track land rights for multiple substation and transmission line projects across Türkiye following presidential expropriation decrees.
نقلًا عن Yeşil Haber

Croatia distribution operator plans EUR 2 billion grid upgrade programme
Croatia advances a EUR 2 billion distribution grid plan, targeting major substation refurbishments and capacity expansions across regional supply zones.
نقلًا عن Balkan Green Energy News

Gennaker offshore substations transit to Baltic Sea for 927 MW grid link
Offshore substations for the 927 MW Gennaker wind farm transit to the Baltic Sea to connect offshore generation to the German transmission network.
نقلًا عن Offshorewind.biz

UAE and Saudi Arabia assess bilateral electricity interconnection
The UAE and Saudi Arabia explore bilateral power grid interconnection and electricity trading under a wider cross-border infrastructure pact.
نقلًا عن MEED

African transmission bottlenecks stem from funding gaps rather than planning deficits
Africa faces severe grid bottlenecks due to funding shortages rather than poor planning, leaving substation assets overstressed and unreinforced.
نقلًا عن ESI Africa

Two 400 kV supergrid transformers energized at Hams Hall 350 MW battery site
National Grid has energised two 400 kV, 220 MVA supergrid transformers at the 350 MW, 1.22 GWh Hams Hall storage plant ahead of operational launch.
نقلًا عن Transformer Technology
ابدأ بتقييم الحالة
أخبرنا بالمعدات والموقع والظروف القائمة. إذا كانت حالة محولاتك غير معروفة، فالتقييم هو الطريقة الأقل التزامًا لمعرفة ما لديك فعلًا — وهو يحدد ما يأتي بعده.