Strana 7 z 25
Analýzy vývoja v oblasti transformátorov, elektrických staníc a sústav, písané pre ľudí, ktorí tieto zariadenia prevádzkujú. Každý článok je naším vlastným výkladom vývoja – na zdroj odkazujeme, nepreberáme ho.
73–84 z 297

Factory Expansion in Germany Targets Power Transformer Supply Bottlenecks
An expanded factory site in Germany aims to ease global transformer lead times as transmission systems face severe grid equipment shortages.
Zdroj správy: Transformer Technology
Nigeria plans transmission network expansion to boost national grid capacity
Nigeria outlines extensive transmission grid investments to expand national network capacity by 19000 MW and improve overall power system stability.
Zdroj správy: AllAfrica

SSE Selects Preferred Vendor for 1.4 GW Berwick Bank B Offshore Substations
SSE selects a preferred supplier for offshore substations and turbines on the 1.4 GW Berwick Bank B project, supporting up to 2677 skilled jobs.
Zdroj správy: Construction Review Online
UK flexible connection drive secures 100 million pounds
Aurora Utilities raises 100 million pounds to accelerate flexible grid connections for clean generation, data centres and charging hubs across the UK.
Zdroj správy: BusinessGreen

Türkiye outlines massive energy system investment for decarbonisation
Türkiye needs about 300 billion dollars to decarbonize its energy system, driving grid expansions and renewable energy collector substations.
Zdroj správy: Daily Sabah

National Grid awards converter station contract for Scottish link
National Grid has awarded the southern converter station contract for a proposed Scotland to England HVDC link, subject to statutory planning consent.
Zdroj správy: Transformers Magazine
Corinth–Kos link contract awarded in major Greek island grid expansion
IPTO awards a €1.5 billion contract for the Corinth–Kos interconnector, linking Aegean islands to the Greek mainland grid and phasing out heavy fuel.
Zdroj správy: SEE Energy News

Surging grid equipment backlogs extend procurement cycles
Rising orders for transformers, switchgear and HVDC systems stretch manufacturer backlogs, forcing utilities to rethink fleet maintenance.
Zdroj správy: Transformers Magazine

Türkiye and Saudi Arabia Sign 3000 MW Wind, Storage and HVDC Pact
Türkiye and Saudi Arabia outline a 3000 MW energy pact featuring wind power, battery storage and HVDC transmission infrastructure without a set timeline.
Zdroj správy: Yeşil Haber

TenneT signs connection agreement for 400MW Stadorf battery project in Germany
Elements Green signs a TenneT connection deal for a 400MW and 1600MWh battery project in Germany, driving technical demands for substation equipment.
Zdroj správy: The Energyst
Nigerian Customs Releases 98 Containers of Substation Equipment Stranded for 20 Years
Nigerian customs authorities release 98 stranded containers of power equipment after 20 years to alleviate severe pressure on electrical substations.
Zdroj správy: AllAfrica

Croatia commissions 60MW / 120MWh standalone transmission BESS
Croatia connects its first standalone 60MW/120MWh transmission-level battery storage facility at Šibenik, setting a precedent for Balkan grid integration.
Zdroj správy: Energy-Storage.news
Začnite posúdením stavu
Opíšte nám zariadenia, lokalitu a situáciu. Ak stav parku nie je známy, posúdenie je najmenej záväzný spôsob, ako zistiť, čo skutočne máte – a určí všetko, čo príde potom.