Strana 20 z 25
Analýzy vývoja v oblasti transformátorov, elektrických staníc a sústav, písané pre ľudí, ktorí tieto zariadenia prevádzkujú. Každý článok je naším vlastným výkladom vývoja – na zdroj odkazujeme, nepreberáme ho.
229–240 z 298

Cybersecurity risks exposed across wind and solar sites in 35 European nations
A comprehensive study reveals security flaws across wind and solar installations in 35 nations, raising operational blackout risks for regional grid nodes.
Zdroj správy: Balkan Green Energy News
Montenegro approves €40 million grid expansion for 488 MW wind projects
Montenegro TSO CGES approves a €40 million grid expansion, including a new 400/110 kV substation, to connect 488 MW of wind generation capacity.
Zdroj správy: SEE Energy News

Romania begins building 50 MW battery storage site with 63 MVA substation
Construction starts on a 50 MW battery facility in Romania with a dedicated 20/110 kV substation, highlighting storage grid-integration trends across the region
Zdroj správy: Transformer Technology

Tunisia-Italy power link secures over 1.35 billion euros in funding
Financing for the Tunisia-Italy interconnector exceeds 1355.7 million euros, unlocking major high-voltage transmission and converter substation works.
Zdroj správy: La Presse de Tunisie

National Grid secures 6.5 million dollars for live-line maintenance project
National Grid secures 6.5 million dollars to develop specialised live-line equipment and procedures for energised high-voltage transmission assets.
Zdroj správy: Transformers Magazine

Bushing lead times and factory expansions reshape transformer procurement
Component supply constraints and extended bushing delivery schedules force transmission and distribution utilities to rethink substation asset strategies.
Zdroj správy: Transformers Magazine
Romania Mintia gas plant begins commissioning for grid connection
Romania starts commissioning the 1.7 GW Mintia gas-fired plant, representing a €1.2 billion investment to stabilize the regional electricity grid.
Zdroj správy: SEE Energy News

Connecting Large Solar Assets with Dual Rating Step-Up Transformers
Integrating a 115 MW solar generator in France requires step-up transformation at 93/33 kV, highlighting primary substation design for renewables.
Zdroj správy: Transformer Technology

Türkiye explores cross-border power corridor with Saudi Arabia and regional neighbours
Türkiye discusses a regional electricity transmission link with Saudi Arabia, Jordan and Syria, creating long-distance grid interconnector demand.
Zdroj správy: Daily Sabah
R.Power completes battery installation for 127 MW storage asset in Romania
R.Power completes physical battery setup for a 127 MW and 254 MWh energy storage facility in Romania, with grid energisation targeted by 2026 or 2027.
Zdroj správy: Energynomics

National Grid decommissions 180-tonne transformers at Pelham
National Grid removes 180-tonne Pelham transformers after 35 years, conducting internal teardowns to inform future transmission asset design.
Zdroj správy: Transformer Technology
Lagos Sets 3000 MW Target for March 2027 to Bolster Sub-Transmission Capacity
Lagos plans to reach 3000 MW by March 2027, requiring major sub-transmission upgrades and embedded generation integration across Nigeria.
Zdroj správy: AllAfrica
Začnite posúdením stavu
Opíšte nám zariadenia, lokalitu a situáciu. Ak stav parku nie je známy, posúdenie je najmenej záväzný spôsob, ako zistiť, čo skutočne máte – a určí všetko, čo príde potom.