Side 9 av 25
Analyse av utviklingen innen transformatorer, transformatorstasjoner og nett, skrevet for dem som drifter anleggene. Hver artikkel er vår egen vurdering av en utvikling – vi lenker til kilden i stedet for å gjengi den.
97–108 av 297

Vacuum Tap-Changers for Converter Transformers in High-Voltage Direct Current Links
Vacuum on-load tap-changers enhance reliability for converter transformers in high-voltage direct current schemes, reducing maintenance and outage risks.
Omtalt av Transformers Magazine

Türkiye places electrification at centre of energy strategy to 2040
Türkiye outlines a national energy strategy to 2040 centred on electrification, driving major grid expansion and substation investment.
Omtalt av Daily Sabah
Ugandan Inquiry Links Frequent Grid Outages to Ageing Transformer Fleet
A parliamentary inquiry in Uganda reveals that almost half of the national power transformer fleet has been in service for more than 30 years.
Omtalt av AllAfrica
Firm Grid Connection Pricing Reshapes Renewable Investments in Southeast Europe
Scarcity of grid capacity drives market-based connection access in Romania, increasing financial pressure on renewable developers and substation lead times.
Omtalt av SEE Energy News

Resolving Nameplate Limits and True Transformer Loading Capability
An analysis of how nominal transformer ratings evolve into dynamic thermal loading rules for grid operators balancing network security and asset life.
Omtalt av Transformers Magazine
Tanzania seeks AfDB financing for 400 kV transmission corridor
Tanzania engages the African Development Bank to fund a strategic 400 kV transmission corridor connecting Kisongo, Same and Segera to strengthen grid capacity.
Omtalt av AllAfrica

Unlicensed Solar and Wind Capacity Drops by 124 MW in Türkiye
Available distribution headroom for unlicensed solar and wind in Türkiye declined by 124 MW to 501 MW as 29 entries were reset, TEİAŞ data shows.
Omtalt av Yeşil Haber

Online DGA reveals core and frame insulation faults in power transformers
Online dissolved gas analysis detects developing core and frame insulation defects in power transformers before major forced outages occur.
Omtalt av Transformers Magazine

Calls Grow for Ofgem to Publish Complete Grid Connection Queue Data
Calls for Ofgem to publish the full grid connection queue highlight severe network bottlenecks affecting United Kingdom energy and power projects.
Omtalt av Energy Live News
Bulgarian grid upgrades see 182 million euro investment
Bulgaria's ESO commits over 182 million euros to grid modernisations and 120 kilometres of lines since 2026, boosting Balkan power network resilience.
Omtalt av SEE Energy News
North Macedonia Blended Financing for 100 MW Battery Storage Project
North Macedonia plans a 100 MW battery project in Bitola costing 98 million euros, using blended financing to overcome market liquidity challenges.
Omtalt av SEE Energy News

UK Energy Independence Bill Targets Faster Grid Consenting and Upgrade Investment
The UK Energy Independence Bill aims to streamline planning and speed up grid investment, impacting substation delivery and equipment procurement.
Omtalt av New Civil Engineer
Start med en tilstandsvurdering
Fortell oss om anleggene, stedet og situasjonen. Er tilstanden i transformatorparken ukjent, er en tilstandsvurdering den minst forpliktende måten å finne ut hva dere faktisk har på – og den legger grunnlaget for det som kommer etterpå.