Side 18 av 25
Analyse av utviklingen innen transformatorer, transformatorstasjoner og nett, skrevet for dem som drifter anleggene. Hver artikkel er vår egen vurdering av en utvikling – vi lenker til kilden i stedet for å gjengi den.
205–216 av 297

EPDK enacts rules on unlicenced generation, storage and SCADA
EPDK introduces a 900 kW threshold, storage integration criteria and SCADA communication requirements across distribution networks in Türkiye.
Omtalt av Yeşil Haber

Abolition of leap seconds moved to 2027 to protect smart grid time synchronisation
The decision to end leap second adjustments on 20 May 2027 removes timing disruptions across power transmission networks and digital substation automation.
Omtalt av Yeşil Haber
Greece seeks survey restart for €1.9 billion Great Sea Interconnector
Geopolitical friction stalls seabed surveys for the €1.9 billion Greece-Cyprus interconnector, complicating converter station lead times and grid works.
Omtalt av SEE Energy News

EirGrid Completes Survey Campaign for 900 MW Irish Offshore Wind Link
EirGrid concludes survey work for an offshore wind export route in Ireland, establishing critical seabed and landfall data for a 900 MW grid link.
Omtalt av Offshorewind.biz
Uganda warns of power tariff rises as demand overwhelms distribution substations
Uganda considers power tariff increases as overloaded substations and ageing distribution equipment lead to frequent blackouts across expanding networks.
Omtalt av AllAfrica

Swissgrid advances 380 kV upgrade for Alpine transmission corridor
Swissgrid awards engineering for three substations, preparing a 27 km link for a shift from 220 kV to 380 kV with extensive underground cabling.
Omtalt av Transformer Technology

Nexans Begins Production of 525 kV Subsea HVDC Cables for LanWin2
Manufacturing has commenced for 525 kV subsea high-voltage direct current cables intended for the German LanWin2 offshore grid connection infrastructure.
Omtalt av Offshorewind.biz

TEİAŞ advances 154 kV grid link for Türkoğlu industrial zone
TEİAŞ initiates urgent land acquisition for a 154 kV transmission connection linking Türkoğlu industrial zone and industrial facilities in Kahramanmaraş.
Omtalt av Enerji Günlüğü

Pure DC Installs 75 MVA Unit at London Site
Pure DC has placed a 75 MVA transformer at its 90 MW London facility, pushing total substation capacity to 150 MVA ahead of energisation in 2026.
Omtalt av Transformer Technology
Transelectrica commissions STATCOM systems to stabilise voltage
Transelectrica installs STATCOM systems to manage reactive power and voltage fluctuations as renewable capacity expands across the Romanian grid.
Omtalt av SEE Energy News
TEİAŞ initiates land expropriation for 400/154 kV Likya Havza substation in Antalya
TEİAŞ moves to expropriate site land for the planned 400/154 kV Likya Havza substation project to reinforce transmission capacity around Antalya.
Omtalt av Enerji Günlüğü

ESB Networks doubles Drumline 110 kV substation capacity to 20 MVA
ESB Networks completes transformer upgrades at Drumline 110 kV station, replacing two 5 MVA units with 10 MVA plant to expand local capacity to 20 MVA in 2026.
Omtalt av Transformer Technology
Start med en tilstandsvurdering
Fortell oss om anleggene, stedet og situasjonen. Er tilstanden i transformatorparken ukjent, er en tilstandsvurdering den minst forpliktende måten å finne ut hva dere faktisk har på – og den legger grunnlaget for det som kommer etterpå.