Pagina 15 di 25
Analisi degli sviluppi relativi a trasformatori, sottostazioni e reti, scritte per chi gestisce gli impianti. Ogni articolo è una nostra lettura di uno sviluppo: rimandiamo alla fonte anziché ripubblicarla.
169–180 di 297
Suceava-Bălți 400 kV line advances towards 2027 construction start
Transelectrica prepares for a 2027 start on the 400 kV Suceava-Bălți interconnector, covering 93.3 kilometres to reinforce cross-border power flows.
Riportato da SEE Energy News

Vorarlberger Energienetze Orders 123 kV Regulating Transformers Worth $45.9M
Vorarlberger Energienetze has awarded contracts worth $45.9 million (€40.89 million) for 123 kV regulating transformers across regional substations.
Riportato da Transformer Technology
Transelectrica prepares transmission grid development plan for 2026 to 2035
Transelectrica shareholders vote on November 9 regarding a grid plan covering 2026 to 2035, featuring 117 strategic network investment projects in Romania.
Riportato da Energynomics

Automated drone surveys inspect 500 pole-mounted distribution transformers in the UK
A UK distribution network operator has gathered aerial visual data from 500 pole-mounted transformers to evaluate automated corrosion detection.
Riportato da Transformer Technology

Lithuania DSO awards 110/10 kV 16 MVA transformer contract
Lithuania awards contract for 110/10 kV 16 MVA transformers under EU notice 727152-2026 signed October 19. Read analysis of Baltic grid procurement.
Riportato da Transformer Technology

National Grid trials temporary encapsulation to capture switchgear gas leaks
National Grid trials temporary flexible enclosures to capture fugitive switchgear emissions, helping utilities avoid emergency substation outages.
Riportato da The Energyst
Transelectrica advances cross-border 400 kV transmission links
Transelectrica accelerates northern cross-border transmission expansion with 400 kV lines linking Suceava and Balti to reinforce regional reliability.
Riportato da Energynomics

Eurogrid Secures 560 Million Dollars in Green Bonds for 50Hertz Grid Investment
Eurogrid secures 560 million dollars at 4.48 per cent interest to finance transmission grid expansion and reinforcement for German TSO 50Hertz.
Riportato da Transformers Magazine

Commissioning advances on 600 MWh and 120 MWh battery projects
Commissioning of a 600 MWh battery facility and connection of a 120 MWh site highlight transformer duty cycles and collector grid integration.
Riportato da Solar Power Portal

EU backing for modular 2.5 MW platform targets integrated conversion
European funding of 39.3 million euros will industrialise a modular 2.5 MW power platform, merging medium-voltage switchgear and transformers.
Riportato da Transformer Technology

French storage pipeline advances with 239MWh commitment
Axpo and Enertrag reach final investment decisions for French storage totalling 239MWh, introducing 3-hour battery designs to the transmission network.
Riportato da Energy-Storage.news
Mozambique plans 126 million dollar solar plant for mining loads in Gaza province
Mozambique plans a 126 million dollar solar farm in Gaza province to power mining operations, requiring robust substation design and grid integration.
Riportato da AllAfrica
Cominci con una valutazione dello stato
Ci indichi le macchine, il sito e la situazione. Se lo stato del parco non è noto, una valutazione è il modo meno impegnativo per scoprire che cosa Lei ha davvero, e definisce tutto ciò che viene dopo.