Trafoser is bought as a programme with a defined outcome, not as a list of service line items. That is how utilities, industrial operators, IPPs and development-finance programmes actually procure, and it is how these pages are organised.
Einsatzprogramme
08
Mobilisierungsphasen
08
Sweep frequency response analysis run from the transformer cover, the traces on the laptop.
01/08Start here
Fleet condition assessment
A structured survey of your transformer population that produces a ranked, evidence-based picture of asset health and a prioritised intervention plan.
An active part craned over its tank, with fitters at the tank edge.
02/08
Rehabilitation and life extension
Refurbishing a degraded transformer and returning it to reliable service instead of replacing it — weeks instead of years, at a fraction of replacement cost.
An active part lifted from its tank in the switchyard under a mobile crane.Fitting a high-voltage bushing, guided from a crane basket and steadied at the turret.
04/08
Installation and commissioning
New assets from delivery to energisation, with the test evidence a lender or an asset owner reviews before accepting the asset.
For a remote or cross-border site, the programme also carries shipping, temporary import, customs, permits, abnormal-load transport, site generation, fuel and water planning, satellite communications, and a contingency for the part that does not clear customs. It is planned before the technical work, because it decides whether the technical work happens.
Mobilisation — eight stages, enquiry to demobilisation
Choose what testing or inspection has shown, and see the tests that characterise it, the standards it is read against and the programmes that address it.
Tell us the assets, the site and the situation. If the fleet's condition is unknown, an assessment is the lowest-commitment way to find out what you actually have — and it defines whatever comes next.